Construction of infrastructure network for overall complex Porto Novi, including as follows:

  • Installation of cable ducts for telecom, street lighting, MV and LV, in length of 40,68 km;
  • Installation of HDPE pipe for potable water, irrigation and FF system, in length of 5,40 km;
  • Installation of HDPE pipe for LPG, in length of 1,92 km;
  • Installation of PVC and PPR pipes for foul and stormwater sewer of diameter up to 1200 mm, in overall length of 6,10 km;
  • Installation of pre-insulated steel heating and cooling pipes, in length of 5,81 km;
  • Road improvement on surface area of 12.900 m2 with belonging slot drains, in length of 4,20 km.

 